BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//7.2.3.1//EN
TZID:America/Los_Angeles
X-WR-TIMEZONE:America/Los_Angeles
BEGIN:VEVENT
UID:55-184@sjbr.r9-asce.org
DTSTART;TZID=America/Los_Angeles:20250718T140000
DTEND;TZID=America/Los_Angeles:20250718T160000
DTSTAMP:20250711T205830Z
URL:https://sjbr.r9-asce.org/events/anderson-dam/
SUMMARY:Technical Tour: Anderson Dam Tunnel Project
DESCRIPTION:Join the ASCE San Jose Branch for an exciting tour of the Ander
 son Dam Tunnel Project. The tour will take place on Friday\, July 18\, 202
 5\, from 2:00PM to 4:00PM at the project site and will be led by members o
 f the Valley Water project delivery team. Space is limited to the first 25
  registrants. Registration will close on Wednesday\, July 9\, at 12:00PM\,
  or once all spots are filled - whichever comes first.\nImportant Note: Pe
 rsonal Protective Equipment (PPE) is required. PPE includes a safety vest\
 , hard hat\, and closed toe shoes. Attendees must bring their own PPE.\nDa
 te: July 18\, 2025\nTime: 2:00PM - 4:00PM\nLocation: Anderson Dam Tunnel P
 roject Site\nMorgan Hill\, CA\nSite address will be provided one week prio
 r to the event.\nProject Description: Anderson Dam is a 240-foot-tall eart
 hen embankment dam located just east of Morgan Hill\, California. The Ande
 rson Dam Tunnel Project (ADTP) is currently under construction and represe
 nts the first major step toward the larger Anderson Dam Seismic Retrofit P
 roject (ADSRP). The ADTP involves the construction of an approximately 1\,
 700-foot-long tunnel under the dam’s right abutment\, including a new la
 ke tap and outlet structure. This tunnel will serve as the initial means o
 f flow diversion for the upcoming ADSRP construction and will ultimately b
 e integrated into the dam’s permanent outlet works. The ADSRP is the lar
 gest project ever undertaken by Valley Water\, involving a near-complete r
 econstruction of the earthen embankment dam\, significant spillway upgrade
 s\, and comprehensive improvements to the outlet works.\nThe ASCE San Jose
  Branch is a subsidiary of the ASCE San Francisco Section\, a 501c(3) non-
 profit organization\, operating locally in the San Francisco bay area.\n&n
 bsp\;\nWaiver Required\nAll attendees must review and sign the waiver belo
 w. Signed waivers must be uploaded below prior to completing registration.
 \n\nDownload Waiver\n[wpforms id="1792"]
ATTACH;FMTTYPE=image/jpeg:https://sjbr.r9-asce.org/wp-content/uploads/site
 s/55/2025/06/Anderson-Dam.png
CATEGORIES:San Jose Branch
LOCATION:Anderson Dam Tunnel Project Site\, 18401 Cochrane Road\, Morgan Hi
 ll\, California\, 95037\, United States
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=18401 Cochrane Road\, Morga
 n Hill\, California\, 95037\, United States;X-APPLE-RADIUS=100;X-TITLE=And
 erson Dam Tunnel Project Site:geo:0,0
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
X-LIC-LOCATION:America/Los_Angeles
BEGIN:DAYLIGHT
DTSTART:20250309T030000
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR